Military Projects
Project: Creech Air Base - Flight Simulator
Location: Creech AFB, NV
Completion: March 2011
Estimated Construction Cost: $10 Million

Design and construction of a single-story 18,000 square foot facility that will house the flight simulators used in the pilot training for unmanned aircraft.

The project will be designed and constructed to obtain a LEED silver certification upon completion.











Project: F-16 Aggressor Hangar/Aircraft Maintenance Unit & Green Flag Operations
Location: Nellis Air Base, NV
Completion: November 2011
Estimated Construction Cost: $15 Million

The first phase of the $15 million project consists of a 19,126 square foot Green Flag operations building and 150,000 square foot outdoor athletic complex. The Green Flag facility, which provides support for pilots, includes both secure and non-secure administrative space and a 150 seat auditorium. The track and field includes an all weather running track with an artificial turf field.

The second phase of the project is construction of the 39,797 square foot F-16 Aggressor Hangar Aircraft Maintenance Unit. The design features of the hangar portion of the F-16/AMU facility include sliding hangar doors for aircraft and a 5-ton bridge crane for aircraft maintenance. The two-story AMU portion of the facility includes spaces for administrative functions, training, supply storage, and features exterior decks.








Project: UAS Extended Range/Multi-Purpose Facility
Location: Sierra Vista, AZ
Completion: March 2012
Estimated Construction Cost: $8.6 Million

The $8.6 million high bay UAS facility is a design/build project that will house six Predator aircraft and provide administrative, common and utility support areas. The building’s service bays will require special design features including high ceilings, large coiling doors, an overhead bridge crane and translucent clerestory windows.

In order to achieve LEED® Gold certification, the design includes a solar hot water heating system, underground rainwater storage tanks and water efficient plumbing fixtures. The landscape design includes drought-tolerant and native landscaping, as well as bike racks and parking for low-emission vehicles and carpools.










Project: Nellis Fitness  Center
Location: Nellis Air Base, NV
Completion: November 2011
Estimated Construction Cost: $25 Million

Construction of a 109,000 square-foot fitness center including three basektball courts, an indoor swiming pool, indoor track and a weight room.






















Project: Creech Ops Building
Location: Creech AFB, NV
Completion: November 2012
Estimated Construction Cost: $10 Million

Design and construction of a single story 30,000 square foot facility that will house the operations facilities for the Air Force's unmanned aircraft mission.

The project will be designed and constructed to obtain a LEED silver certification upon completion.













Project: NAFB F-35 Flight Simulator Facility
Location: Nellis AFB, NV
Completion: November 2012
Estimated Construction Cost: $20 Million

Design and construction of a single-story 18,000 square foot facility that will house the flight simulators used in the pilot training for unmanned aircraft.

The project will be designed and constructed to obtain a LEED silver certification upon completion..









Project: AGE Maintenance Facility
Location: Davis Monthan AFB, AZ
Completion: December 2012
Estimated Construction Cost: $30 Million

Design and construction of a single-story 18,000 square foot facility that will house the flight simulators used in the pilot training for unmanned aircraft.

The project will be designed and constructed to obtain a LEED silver certification upon completion..










Copyright © 2016 Diamondback Land Surveying,LLC
6140 Brent Thurman Way,  Suite 230, Las Vegas, Nevada 89148 (o) 702.823.3257 (f) 702.933.9030
Always do right! This will gratify some people & astonish the rest.