Project: Las Vegas Ski & Snow Board Resort
Location: Mount Charleston, NV


Boundary and Topographical Survey for the Lee Canyon Ski Resort. The engineering design calls for the expansion of existing 1 million gallon water pond to an 8 million gallon water pond to increase their snow making abilities during the winter ski season. The main project oversight is by the U.S. Forest Service since the facility is on a Forest Service Lease.

Environmental Projects



Project: Tronox Incorporated
Location: Henderson, NV


Survey the location for 95 Soil Vapor Locations, 238 Soil Boring Locations and 11 Monitoring Wells. All locations will be in accordance with Section 4.8.1 of the Basic Remediation Company SOP-10 (Surveying) manual.








Project: Timet
Location: Henderson, NV


Survey volumes and verifications for asbestos removal.









Copyright © 2016 Diamondback Land Surveying,LLC
6140 Brent Thurman Way,  Suite 230, Las Vegas, Nevada 89148 (o) 702.823.3257 (f) 702.933.9030
Always do right! This will gratify some people & astonish the rest.