Project: Red Rock Canyon National Conservation Area
Location: Clark County, NV
Completion: Summer 2010
Estimated Construction Cost: $23 Million

The current visitors center will be refurbished and used for staff offices and support services.

The indoor part of the new center is the arrival building, which, at 2,000 square feet, has traditional exhibits. It also will house a gift shop and restrooms.

The outdoor portion takes a creative approach and doesn't cut up exhibits into the usual categories, like geology, cultural history, flora and fauna. Instead, the focus is the elements of nature: Earth, air, fire and water.





Project: Nevada Solar One
Location: Boulder City, NV
Completion: June 2007
Estimated Construction Cost: $266 Million

The 64MW Nevada Solar One concentrated solar power plant went online in the USA June 2007. With 400 acres of solar concentrators, Nevada Solar One has become the third biggest solar thermal power plant in the world.





Project: Indian Springs Prison
Location: Indian Springs, NV
Completion: Spring 2010
Estimated Construction Cost: $45 Million

Expansion to the existing Indian Springs correctional facility. The project included 6 new buildings, about a mile of roadways throughout the site. Provided construction staking for the 40-acre project.





Project: Core Office Building
Location: Las Vegas, NV
Completion: July 2008
Estimated Construction Cost: $12 Million

CORE Construction’s 12,543-square-foot office building boasts natural lighting for every office and hallway; recycled insulation from denim jeans; recycled glass floors; a heating/cooling system that operates on a carbon dioxide sensor; dedicated recycling area; pervious concrete in parking areas to recharge groundwater; landscaping from recycled concrete of the pre-existing sidewalk; and generates electricity through 99 photovoltaic panels.





Project: Legacy High School
Location: North Las Vegas, NV
Completion: August 2006
Estimated Construction Cost: $40 Million

Combination one-story and two-story masonry and steel framed building, athletic play fields, sidewalks, fencing, streets, parking and landscaping.








Project: Nevada State College
Location: Henderson, NV
Completion: July 2008
Estimated Construction Cost: $22 Million

The two-story building contains 42,587 square feet of space that includes six classrooms, two tutoring/auxiliary classrooms, five laboratories and 48 faculty offices. It will be the first official building for the school, and the remaining portion of the land may include retail components, residential condominiums and multiple academic facilities.





Project: Western High School Additions
Location: Las Vegas, NV
Completion: August 2007
Estimated Construction Cost: $22 Million

Construction of two new high school buildings at an existing campus, including demolition of existing facilities, site utilities, site construction, landscaping and earthwork.





Project: Centennial Hill Community Center
Location: Las Vegas, NV
Completion: July 2007
Estimated Construction Cost: $36 Million

Construction of Nevada largest municipal community center/aquatics complex in the City of Las Vegas. The project includes approximately 98,385 square feet of building space, two indoor swimming pools and two outdoor swimming pools, outdoor amenity areas, site work, off-site work, utility work, and complete right-of-way improvements for the re-alignment of Deer Springs Way. The project site is on approximately 20.5 acres of BLM owned land, under lease to the City of Las Vegas.




Project: LaPour Office Building
Location: Las Vegas, NV
Completion: July 2008
Estimated Construction Cost: $19 Million

The $19 million, 70,000-square-foot LaPour Corporate Center will be the valley's first LEED certified suburban office building.








Project: Montecito Marketplace
Location: Las Vegas, NV
Completion: November 2007
Estimated Construction Cost: $38 Million

Construction staking for 400,000sqft. retail center on
the southeast corner of Durango and Elkhorn.








Project: Town Square ALTA
Location: Las Vegas, NV
Completion: March 2008

Provided ALTA survey for a $1.5 Billion dollar
construction loan on a 116 acre mixed use project. 1.8 million square feet of retail, 225 room luxury hotel and
20 screen cinema.







Project: Henderson Commerce
Location: Henderson, NV
Completion: November 2008
Estimated Construction Cost: $30 Million

Construction staking for 500,000sqft. industrial center
on the southwest corner of Warmsprings and Eastgate.









Project: Durango & Centennial Center Retail 1, 2 & 3
Location: Las Vegas, NV
Completion: December 2007
Estimated Construction Cost: $19 Million

Construction of three shell buildings and associated site work.







Project: Centennial Project
Location: Clark County, NV
Completion: Summer 2007
Estimated Construction Cost: $300 Million


Two 500kv transmission lines with a construction cost of $300 million dollars.  Aerial control, centerline design topographic work, construction staking of 370 lattice towers, boundary retracement from BLM/USGLO plats and field notes to determine route alignment and easements for 80 miles of corridor.





Project: JF622, LLC
Location: Kingman, Arizona
Completion: April 2006

JF622, LLC is a 622-acre section in Kingman, AZ. The site was farther subdivided into 16 lots of 36 acres or larger, We provided master planning, design, and field surveying services for the entire site.



Click on the map above.





Project: Sec. 3 & Sec. 35
Location: Outside Hackberry, AZ
Completion: February 2007

Two 640-acre sections in Outside Hackberry, Arizona.  The sites were originally subdivided in 1954 with 256 lots of 2.5-acres for one section and 512 lots for the other section.  Provided layout design for 250+ lots requiring re-creating the entire subdivision for the layout of the lots.



Click on the map above.







Project: Custom Residence
Location: Pine Valley, UT
Completion: March 2008

Boundary, topographical and custom
home layout surveying.






Project: Vista Bella
Location: Kingman, AZ
Completion: March 2011

1482-lot residential subdivision.  Aerial control for topographic work for civil design, boundary control for sectional break down, and drawing of final map.








Project:Dr. Miriam & Sheldon G. Adelson School
Location: Las Vegas, NV
Completion: August 2008
Estimated Construction Cost: $20 Million

Construction staking for 13.7 acre, 135,000 square
foot independent Jewish high school.












Project: California Highway Patrol
Location: Blythe, CA

Boundary and Topographical survey for California
Highway Patrol Office in Blythe, CA














Project: Various Cell Towers
Location:From Temecula, CA to Stockton, CA


Boundary and Topographical surveys as well as
Hi Definition 3D scanning for various cell tower site in southern California. From Temecula, CA to Stockton, CA